Latest Handover Snagging List (Sep 2023)
By Nige
on September 24, 2023
at 3:13 pm
Type: Post
Category: Handover
Tags: Bloor Homes | East Midlands Landscaping
Ensuring TDRA maintains an up to date snagging list is an important aspect of the handover process.
This article includes TDRA’s latest snagging list. I.e. the list of items of outstanding work. This will be used to feed into the meeting on Mon 2nd October.
TDRA invite residents to review/update this list, so that it is as accurate as it can be.
We have summarised the Key Points for those who just want the headlines and for those that would like to read a little more, head to our In-Depth Analysis.
Key Points
- Since the last meeting in March 2022, Bloor Homes has undertaken some items of work that were outstanding, but they were not prepared to complete all works with VWHDC not able to inspect and sign off this work.
- TDRA has revised its latest snagging list. This covers all of the work that Bloor needs to complete before handover can proceed.
- It’s really important for residents to review this list and to advise the RA if changes are required.
- Deadline for residents to advise of changes is Fri 29th Sep 2023.
In-Depth Analysis
Latest Snagging List
The latest view of work to be completed is noted below. This follows the structure of notes prepared at the last Pre-Inspection meeting.
Notes:
- Two previous “Pre-Inspection” meetings have been held: one on Tue 12/10/2021 and the last one on 01/03/2022.
- Proposals and actions were noted at the meeting on Tue 01/03/2022.
- The Updates in blue, are the RA’s notes made ahead of the next meeting scheduled to take place on Mon 02/10/2023. These include maintenance that remains outstanding. These are prefixed by Maintenance in blue.